The reconstruction of the Mutsamudu-Sima route and its accolades Sima Boungweni and Sima-Bimbini (Union of Comores) 01

26 km of roads

Total Road Length: 26 km of roads.

Project Includes: Mutsamudu-Sima axis and two ramps (Sima-Boungouéni and Sima-Bimbini)

Scope of Works: Design Review, Tender process and site supervision works.